News

Madrid-Barajas airport renews its air conditioning systems

With the award of the work contract, it is expected that the renovation of the air conditioning system at the Adolfo Suárez Madrid-Barajas Airport will begin in the next few days, which will mean the updating of the thermal conditioning systems on the Terminal 4. This equipment is older than ten years and has accessibility problems for their maintenance and obsolescence in their components, which justifies the replacement of the current compact units with new ones. These actions are based on the construction design that G.O.C. carried out in 2018 for a complete renovation of the air conditioning system...

SEE MORE

G.O.C. will design avenues intersection in Madrid

The municipality of Alcobendas has awarded G.O.C. the constructive design and the study of safety and health for the remodeling works of the intersection of Barajas Avenue with Rafael Nadal Avenue. Currently, this intersection consists of a 72 m outer diameter roundabout and two-lane ring roads of 8 m wide, with a landscaped central islet of 56 m in diameter. Barajas Avenue allows access to the A-1 road from Alcobendas, through a roundabout under the highway from which it is possible to access the M-12 road that connects with Madrid-Barajas airport and with the R-2 road. It is, therefore,...

SEE MORE

Igrexa school in Cidadelle ready to open

Coinciding with the beginning of the school year, the Education Department of the Galician Government and the Municipality of Redondela have signed the handover of the new educational center located in the area of ​​Cidadelle, in Redondela (Spain). The building consists of 2,460 m2 built on a plot of 10,500 m2, which includes a 1,056 m2 sports court. As for its functional structure, it is composed of three classroom of Pre-primary education, two for each one of the three cycles of Primary education and three for other uses. The school also includes a library, a computer room, a multipurpose...

SEE MORE

New courthouse inaugurated in Pontevedra

Xunta de Galicia has launched the new judicial building of Pontevedra in A Parda, in which G.O.C. has carried out comprehensive technical assistance for quality control during the execution of the works. It is a 23,500 square meters construction with 6 floors above ground: 2 floors (ground and first) where the courtrooms are located and the following 4 floors for courts, having 7 on each floor and a total of 28 in the whole building. In addition, it has two basement floors, where private parking for building workers and building archives are housed, as well as the equipment rooms....

SEE MORE