Design of the sanitary sewer system of Changuinola. Province of Bocas del Toro.

Design of sewerage network and pumping stations

The project includes the construction of more than 70 kilometres of sewerage networks and four pumping stations with a maximum capacity of 30,000 cubic metres per day.

The objective of this action is to provide Changuinola with an adequate collection and treatment system for wastewater generated from what is currently lacking, benefiting some 50,000 inhabitants of Changuinola, Guabito and El Empalme and reducing by 95% the causes of environmental pollution in the area.

Client: JOCA IPC, JV.

Execution value: € 33 million

Execution term: 39 months

DESIGN/ ENERGY & ENVIRONMENT / PANAMA