New Rail Access to Levante. Section: Access to Albacete

Project design. Control and monitoring of platform works.

It consists of the platform design of an AVE section to access to Albacete from Madrid, with a length of 7,260 meters.

It also includes the amended draft to the conventional line route, including facilities and electrification in a section of about five kilometres, and the modification and adaptation of the train depot in Albacete station.

Within the work affections, a modification of the A-31 layout for the passage on the railroad is included. Structures:
PS 1.1. Crossover.
PS 1.6 (A-31) Crossovers.
PS 4.8. Crossover.
Foot-bridge.
Platform underpass in the station.

G.O.C. carried out the project design with all its Annexes, including topography, layout, expropriations, structures, hydrology, concerned departments, geology and geotechnical engineering, measurements and quotation, etc.

Client: ADIF

Execution value: 58 million

Execution term: 40 months

SUPERVISION / DESIGN / INFRASTRUCTURES / SPAIN

OUR PROJECTS

Ourense Hospital

WWTP Lagares

Saudi Arabia Stations

Costa da Morte Highway

Madrid Air Terminal