Power plant and beaconing for the extension of the airfield in Barcelona Airport.

Work control and monitoring

Technical assistance for control and monitoring of Power Plant and beaconing the enlargement of the Barcelona Airport airfield :

• Block 4: Power plant on the side of the air and beaconing

• Block 5: SSEI building and urbanization

• Block 6: Drainage, motorization and control, pumping stations; Project control; Control of materials; Execution control; Coordination of safety and health; Environmental monitoring.

Client: AENA

Execution value: € 68 million

Execution term: 40 months