Supervision of the construction of the road Costa Verde. Section: Callao

Work control and monitoring

Costa Verde is considered as a regional road that connects Chorrillos with the district of La Punta in just 25 minutes. It also fulfils the need to improve a road connecting major points of the city of Callao, to provide security (against natural phenomena) to a large sector of the population and to promote the transformation of one of the most dangerous areas of Lima.

The work is designed to pave more than 157 thousand square meters of tracks and trails, spread over 140,503.23 square meters of roads and 16,836 square meters of paths, as well as 136,752.38 cubic meters of riprap.
It includes the following sections:

Section 1: Miguel Grau avenue (formerly Buenos Aires) – AAHH Canadá (up to Guardia Chalaca oval).
Section 2: AAHH Canadá – Santa Rosa avenue .
Section 3: Santa Rosa avenue – Jr. Viru (provincial boundary with the district of San Miguel)

Some of the obligations included in the services are the following: to supervise the facilities, equipment construction, laboratory and contractor staff on the works; to confirm the general layout and carry out the survey control; to review implementation designs; safety, quality and environmental control; to draw up the measurements and to make the valorisation of the work progress; to participate in the process of receiving the work.

Client: Gobierno Regional del Callao

Execution value: € 80 million

Execution term: 40 months

SUPERVISION / INFRASTRUCTURES / PERU

OUR PROJECTS

Ourense Hospital

WWTP Lagares

Saudi Arabia Stations

Costa da Morte Highway

Madrid Air Terminal